Public Policy
India Fails To Achieve Even 20% Rooftop Solar Target Ahead Of 2022 Deadline
In 2015, India set a renewable energy capacity target of 175 gigawatts (GW) by 2022 for transitioning to a low-carbon pathway. Of this, 100 GW was earmarked for solar capacity with 40 GW (40 per cent ) expected to be achieved from the rooftop solar sector by 2022. Later, the plan ramped up to 450 GW...